Construction of 400Kv Lines

Construction of the Famalicão-Vermoim, Famalicão-Recarei and Pedralva-Vila Fria Lines of 400Kv

The project consisted in the construction of a section of the common lines with the extension of about 27 km and 61 supports of the family “DL”, with two suits of double beam of cable ACSR595 and two guard cables; An ACSR153 cable and another OPGW to cover the current Recarei-Vermoim line at 400Kv for the Famalicão substation.

Omexom participated in the construction of a section of the line Pedralva-Vila-Fria.

Prev Back to the list Next